Skip to content
Enzo NRG

Power optimization · EnePro

Clean up the power your equipment runs on.

EnePro is a power optimizer installed at your electrical panel or right at your equipment. It cleans up harmonic distortion, corrects power factor and absorbs surges, so your motors and compressors waste less energy as heat, run cooler and last longer.

Fig. 01Watch: how EnePro cleans up the power your equipment runs on.

The problem

Power quality, in plain English.

Power leaves the generating plant clean. By the time it reaches your building, it has travelled miles of lines shared with other customers, and it can arrive already distorted. Then the equipment inside your building adds more distortion of its own. EnePro cleans up both.

  1. Poor power factor

    Motors draw extra current that does no useful work. The wiring still has to carry it, and some utilities add a charge for it.

  2. Harmonics

    Distortion comes in two ways: some arrives on the utility line, and drives, compressors and electronics inside your building create more. Distortion turns into heat in your wires, motors and transformers, which wastes energy and shortens equipment life.

  3. Voltage surges

    Short spikes from switching loads or the grid. Each one adds wear to sensitive controls and motor windings.

DISTORTED · HARMONICS PRESENTCORRECTED · CLEAN SINE
Fig. 02A distorted wave versus the clean wave your equipment is designed for.

What EnePro does

Three jobs, one device.

  • Power factor correction

    Supplies the reactive power your motors need locally, so less unused current travels through your system.

  • Harmonic elimination

    Cleans up distortion coming in from the utility and distortion created by your own drives and compressors, bringing the wave back toward clean.

  • Surge protection

    Absorbs short voltage spikes before they reach your equipment.

The payoff

What it means for your bill and your equipment.

  • Less wasted energy

    Cleaner power means less energy lost as heat in your wiring and motors.

  • Longer equipment life

    Motors and compressors that run cooler last longer and fail less often.

  • Fewer surprises

    Surge protection and cleaner power reduce nuisance trips and damage to controls.

Built for payback

You get your investment back in a few months, then the savings keep coming for years. Your proposal shows the numbers for your site.

Where it fits

Built for motor-heavy loads.

If your facility runs a lot of motors for long hours, it is worth a look.

Every install is done by a qualified electrical contractor.

  • HVAC systems and rooftop units
  • Pumps and lift stations
  • Air compressors
  • Refrigeration and cold storage
  • Production lines and process equipment
  • EnePro unit mounted on a block wall beside a commercial electrical service panel
    At the service panel
  • EnePro unit mounted on the side of a rooftop HVAC unit
    At the equipment

Free bill review

Send us one bill. We will tell you what the numbers support.

One recent electric bill is enough to start. Add a water bill if you have one.

What happens next

  1. 01

    Send a recent bill

    Upload a PDF or a photo, or call and we will walk you through it.

  2. 02

    We review it with our engineering partners

    Your rate, demand charges and usage pattern, line by line.

  3. 03

    You get a straight answer

    What fits your site, and what does not. No pressure either way.

  • No cost
  • No obligation
  • Across North America
CallFree Bill Review